kitchen01
How I spent my summer vacation. Replacing the kitchen floor.
Date: 10/16/2009
Views: 129
|
kitchen02
The decking was completely rotten. I got lucky in that the joists are 4x8 cedar timbers. Even though some were rotted on the top, they were structurally sound.
Date: 10/16/2009
Views: 55
|
kitchen03
I scabbed new cedar 2x4s on to get the tops level for the new decking.
Date: 10/16/2009
Views: 51
|
|
kitchen04
I wore water proof boots the whole time. The two weeks of continuous rain had formed a small lake under the house. Well … maybe not so small.
Date: 10/16/2009
Views: 53
|
kitchen05
With all the recent rain, I had a lake under the house. NOT a pretty blue one.
Date: 10/16/2009
Views: 62
|
kitchen06
Originally, the island was set up with the sink on one side, and the dishwasher on the other. I rotated it 90˚. and moved the dishwasher to the same side as the sink.
Date: 10/16/2009
Views: 61
|
|
kitchen07
I had to set the island on the joists while I worked under it.
Date: 10/16/2009
Views: 66
|
kitchen08
I just sat the island in place where I wanted it, then looked to see what I'd have to do about the plumbing. I couldn't believe it. The sink was right on top of the pipes. All I had to do was rotate the drain line 90˚
Date: 10/16/2009
Views: 50
|
kitchen09
I started ripping up the flooring about 8:30 Friday morning. I decided to keep going until I had the decking down and all of the appliances back in place and hooked up. This is where I was 5:00 Saturday morning when I finally quit.
Date: 10/17/2009
Views: 50
|